Projects Timeline

This page provides a timeline for completed BikePed infrastructure (physical) projects.  It does not include all BikePed-related projects.  The purpose of this page is to allow the user to track the progress of our BikePed infrastructure over time.  If you have any comments or would like a project added to this page, please email jlandosky@littlerock.gov.

Completed 2019

Completed 2018

Completed 2017

Also:

University sharrows (north of Kavanaugh, 25 mph)

33rd Street bike lanes (25 mph)

Arch Street bike lanes (35 mph)

Completed 2016

Also:

36th Street Bike Lanes (30 mph)

Completed 2015

Louisiana protected bike lanes (one way, 30 mph)

Chester Street fog lanes (30 mph)

Daisy Bates fog lanes (35 mph)

Temple Street sharrows (30 mph)

Fourche Dam Pike sharrows (30 mph)

Scott Hamilton sharrows (35 mph)

Completed 2014

17th/Wright/Asher bike lanes (30 mph)

Markham (between Cross and Broadway) sharrows (30 mph)

State Street (between Markham and 4th Street) sharrows (30 mph)

Bond Street (between 2nd and 6th Streets) sharrows (30 mph)

 

Completed 2013

Kavanaugh sharrows (30 mph)

Completed 2011

Two Rivers Bridge

Clinton Presidential Bridge (renovated for BikePed)

Completed 2007 or before

Big Dam Bridge (2006)

Mabelvale Pike bike lanes (40 mph)

Fair Park bike lanes (30 mph)

Riverfront Drive bike lanes (35 mph)

Rebsamen Park Road bike lanes (35 mph)

Loyola Drive fog lanes (30 mph)

Saint Charles Boulevard fog lanes (30 mph)

Chenal Valley Drive bike lanes (35 mph)

Taylor Loop Rd. (N-S, between Cantrell Rd. and Hinson Rd.) fog lanes (35 mph)

Stagecoach Road bike lanes (45 mph)

Lindsey Road fog lanes (30 mph)

Mauney Road fog lanes (30 mph)

University Avenue (south of Asher Street) fog lanes (45 mph)