Projects Timeline

This page provides a timeline for completed BikePed infrastructure (physical) projects.  It does not include all BikePed-related projects.  The purpose of this page is to allow the user to track the progress of our BikePed infrastructure over time.  If you have any comments or would like a project added to this page, please email jlandosky@littlerock.gov.

Completed 2019

Completed 2018

Completed 2017

Also:

North University Avenue sharrows (north of Kavanaugh Blvd., 25 mph)

33rd Street bike lanes (25 mph)

Arch Street bike lanes (35 mph)

Completed 2016

Also:

36th Street Bike Lanes (30 mph)

Completed 2015

South Louisiana Street protected bike lanes (one way, 30 mph)

South Chester Street fog lanes (30 mph)

West Daisy L Gaston Bates Drive fog lanes (35 mph)

Temple Street sharrows (30 mph)

Fourche Dam Pike sharrows (30 mph)

Scott Hamilton Drive sharrows (35 mph)

Completed 2014

17th/Wright/Asher bike lanes (30 mph)

West Markham Street (between Cross and Broadway) sharrows (30 mph)

South State Street (between Markham and 4th St.) sharrows (30 mph)

Bond Street (between 2nd and 6th Streets) sharrows (30 mph)

 

Completed 2013

Kavanaugh sharrows (30 mph)

Completed 2011

Two Rivers Bridge

Clinton Presidential Bridge (renovated for BikePed)

Completed 2007 or before

Big Dam Bridge (2006)

Mabelvale Pike bike lanes (40 mph)

Fair Park Boulevard bike lanes (30 mph)

Riverfront Drive bike lanes (35 mph)

Rebsamen Park Road bike lanes (35 mph)

Loyola Drive fog lanes (30 mph)

Saint Charles Boulevard fog lanes (30 mph)

Chenal Valley Drive bike lanes (35 mph)

Taylor Loop Road (N-S, between Cantrell Rd. and Hinson Rd.) fog lanes (35 mph)

Stagecoach Road bike lanes (45 mph)

Lindsey Road fog lanes (30 mph)

Mauney Road fog lanes (30 mph)

South University Avenue (south of Asher Street) fog lanes (45 mph)