Current Project List - Design 15%
- W 13th St Fairpark to fillmore 01-22-ST-99 15% Plan Drawings
- East 39th St Drainage Park to Riddick 15% plans
- Adell Dr Drainage 05-20-DR-108 15
- Arthur Lane Reconstruction 06-18-ST-B104 15_ Submittal Plans
- Bella Rosa Drive at Taylor Loop Creek 05-17-ST-223B 15% Plan Drawings
- Bowman Road Phase IIĀ 061803 15% Plan Drawings
- Cantrell Road Sidepath 10% Submission Plan
- Chenal BLVD and Chenal Club Signal
- Chenal and Gamble 15% Signal Plans 2024-01-09
- Dorchester Dr Drainage 06-22-DR-004 15% Submittal Plans
- Kirk at Wellington 05-22-DR-38 15% Plan drawings
- Larch Road Drainage 02-22-DR-05_15% Plans and Drainage Map_2024 01 03
- Morrison Ct Drainage 05-17-DR-208A 15% Submittal Plans
- Rose Creek Trail 30% Plan Set
- S Shackleford #07-19-TS-232 15% Plans
- Southwest Trail Interchange 15% Plans
- Valley Drive Drainage Improvements 02-20-ST-171 15% Plan Drawings
- 03.08.2024 Updated 15% Vimy Ridge
- Windsor Drive - Brookview Drive Drainage 07-22-DR-212 15_ Plan Drawings (1)