Current Project List - Design 60%
- West 10th Street Reconstruction 01-19-st-23 60% Plan Drawings
- W 35th Street
- AUTUMN ROAD WIDENING 04-22-ST-2DR 60% PLAN DRAWINGS
- E 38th Street
- 57th Street Drainage 02-22-DR-06_60% Plans_2024 04 01
- F Street Reconstruction 03-18-ST-56_60% Plans_2024 04 09
- Bishop ST Sidewalk 01-18-SW-B322_60% Plans
- Boyd St
- Bridgeport
- Cherrybark 60 Percent Construction Plans r1
- Cherrywood Court Drainage 60%
- Claremore at Reservoir Drainage 04-22-DR-001 60% Plan Drawings
- DAVID O DODD #07-22-DR-017 60% PLANS
- Dryad 208 Drainage 06-22-DR-013 60% Plan Drawings
- Durwood Rd at Brownwood Rd Drainage 03-22-DR-32 60% Drawings
- Jonesboro Dr. Children's Trail (Little Rock) 60% Plan Drawings
- JOHNSON RANCH CULVERT REPLACEMENT 05-22-DR-004B 60% PLAN DRAWINGS
- L Street Drainage between Tyler St and Polk St 03-22-dr-10 60% Plan Drawings
- Polk St (Lee to F St) 03-18-ST-211 60% Plans
- Redwood Drive Drainage 02-22-DR-09 60_ Plan Drawings (1)
- Reservoir Road Improvements 04-22-ST-01 60% Plan Drawings
- Rinke Road
- River Trail Connector 60%
- TAYLOR LOOP CREEK DRAINAGE 05-22-DR-36 60% PLANS
- Woodson Road Reconstruction 02-22-ST-B48 60% Plan Drawings