2018 Road Resurfacing
In 2018, the Bike Friendly Community Committee (BFCC) recommended bicycle infrastructure be considered on X projects; X of those projects had bicycle infrastructure installed (Table 1).

Figure 1. 2018 resurfacing projects in Ward 4 and BikePed Coordinator recommendations for bike facilities (green). I recommended that sharrows not be installed on Fairway Dr., even though the Master Bike Plan calls for them, because this short section would not make a connection.

Figure 2. 2018 resurfacing projects in Ward 5 and BikePed Coordinator recommendations for bike facilities (green).