Current Project List - Design 60%
- West 10th Street Reconstruction 01-19-st-23 60% Plan Drawings
- W 35th Street
- E 38th Street
- Boyd St
- Bridgeport
- Cherrybark 60 Percent Construction Plans r1
- Claremore at Reservoir Drainage 04-22-DR-001 60% Plan Drawings
- DAVID O DODD #07-22-DR-017 60% PLANS
- Dryad 208 Drainage 06-22-DR-013 60% Plan Drawings
- Durwood Rd at Brownwood Rd Drainage 03-22-DR-32 60% Drawings
- Jonesboro Dr. Children's Trail (Little Rock) 60% Plan Drawings
- JOHNSON RANCH CULVERT REPLACEMENT 05-22-DR-004B 60% PLAN DRAWINGS
- 5201 KAVANAUGH 60% PLAN SET - Revised
- Kirk and Rahling Traffic Signal 05-22-TS-180 60% Plan Drawings
- L Street Drainage between Tyler St and Polk St 03-22-dr-10 60% Plan Drawings
- MELLON AT H 03-15-DR-94 60% plan drawings
- Polk St (Lee to F St) 03-18-ST-211 60% Plans
- Redwood Drive Drainage 02-22-DR-09 60_ Plan Drawings (1)
- River Trail Connector 60%
- TAYLOR LOOP CREEK DRAINAGE 05-22-DR-36 60% PLANS
- Woodson Road Reconstruction 02-22-ST-B48 60% Plan Drawings